Friday, 10 October 2008
September Availability: LHCb, the SRM-killer
The unavailability in September at PIC was mainly due to two issues: First, the overload of the SRM server caused by submission of about 13.000 srm-get requests in one shot from LHCb production jobs. This affected the SRM service on three days in September. The first issue that this incident made clear was one of the biggest problems of dCache, from my point of view: there is no way to have different SRM servers, each dedicated to one experiment. We are forced to share the SRM server, so when LHCb breaks it, ATLAS and CMS suffer the consequences. This is clearly bad.
Then one can discuss if issuing 13.000 srm-gets can be considered a DoS, or it is a reasonable activity from our users. I really do think that as a Tier-1 we should stand this load with no problems. As we post this, the storage team at PIC and the LHCb data management experts are in contact to try and learn what exactly got wrong and how to fix it.
Following the saying "better late than never", ATLAS started seriously testing the pre-stage procedure for the reprocessing at the Tier-1s just few days after LHCb. This are good news. This is the only way for us to learn how to configure our system so that it can deliver the required performance. Sure our SRM will die several times during this testing, but I hope it will converge to a reliable configuration... best before spring 2009.
The second contribution to PIC's unreliability last month came from the Network. On 23rd September the Spanish NREN suffered a major outage due to electrical and cooling problems in a TELVENT datacenter, which is hosting the NREN equipment. This resulted in a complete network outage at PIC of about 10 hours. Again, we see electrical and cooling issues at the very top of the LCG service risks list. In the end, looks like one of the trickiest bits of building such a complex computing infrastructure is just plugging it in and cooling it down.
LHC up&down
It is quite funny that the most silent month in our blog was probably the most visible one for the LHC all around the world. Well, we can always say "we did not talk about the LHC here since you could read it in any newspaper" :-)
So, the two big LHC things that happened in September, as all of you know, is that the LHC started circulating beams on Sep 10th and that it then had a major fault on the 19th. You can read the details of these both events anywhere in the web. I will just mention that those were quite special days in our community: the big excitement on the 10th, and then the "cold water bucket" few days later could be felt everywhere. Even the daily operation meeting was less crowded than usual since it was difficult those first days not to feel a bit "what to do now"?
I think now it is quite clear for everyone that life goes on. We at the LHC Computing Grid, continue operations exactly in the same way as we are doing since months. We are not receiving p-p collisions data, true, but the data flow did not stop. Both Cosmics data taking and MonteCarlo generation have not stopped.
We have said many times in the last years that the LHC is a extremely complex machine and that it might take a long time to put it in operations. Well, now we can see this complexity in front of us. There it is. Life goes on.
Monday, 8 September 2008
CMS bends Cosmic Muons...
Last Friday night, September 5th, the current was set to 14500 Amps (3 Tesla central field) for almost two hours to allow an extensive run of all sub-detectors. Cosmic muons bends on presence of magnetic field. The data of this "3 Tesla" magnet commissioning test was distributed to all CMS computing centers and bended tracks were further reconstructed.
With all the parameters being within their reference values, the first phase of the Magnet commissioning underground can be considered achieved. The test plans were fully achieved within the time allowed. The next step will be the test at full current... and to bend the products from proton-proton collissions!
Wednesday, 20 August 2008
Reliability under control... ready for data?
The reliabilities scored by PIC in the last three months (May to July) have been flat at 99%. This is ok and I think this tells us that the Manager on Duty shifts are getting mature. On the one hand the tools available for the shifters are improving: cleaner Nagios and better documentation and procedures (thanks to all of the service managers around) plus, of course, the shifters are doing a great job.
The availabilities for these last three months have moved up 92%-96%-97% for May-June-July, respectively. For these three months we have started implementing a regular Scheduled Downtime on the second (sometimes first) tuesday of the month. Knowing the SD date in advance makes the planning and user notification smoother. The availability in May is somewhat lower because we had an extra downtime on the 14th because the Regional Network Provider had to upgrade some equipment, so PIC had to be disconnected for some hours.
I always say that the SAM monitoring has proven to be a very useful tool for sites to improve on stability. The experiments have since long complained that sometimes they are not reflecting reality, specially because they run under the "fake" OPS VO. The solution is of course that they implement their VO-specific tests in the SAM framework. This is ongoing work since several months, but still not completely stable.
So, looks like we will get the first LHC data with our VO-specific SAM glasses a bit dirty... anyhow, I am sure that the "real data pressure" will help to make all of this converge so we will have still better tools for our shifters to know what's going on.
Monday, 28 July 2008
Euro Science Open Forum in Barcelona

One week ago we had the ESOF08 conference in Barcelona. This was a BIG event devoted to science communication. More than 3000 people attended the "scientific programme"during last weekend. Not bad having into account that the weather in Barcelona was just lovely, and the beach few metro stations away...
There were several presentations about the LHC. On Saturday morning the physics motivation and experiment status presentations were given by several people from CERN. Specially interesting and funny, as usual, was the presentation by Álvaro de Rújula. Unfortunately for the people that were not there, he is still using "analogic transparencies" (made by hand) so no way to download a copy to your PCs.
We organised a session on the LHC data processing and analysis challenge on sunday, and invited Pere Mato and Tony Cass from CERN as speakers. Pere first gave a talk on the challenge of the TDAQ systems in the LHC, to filter out and reduce the number of events from the 40MHz collision rate down to the 100Hz that can be permanently stored. Then Tony Cass presented the main challenges that the CERN computing centre is facing, as the Tier-0 of the LHC Grid. Finally I presented the LHC Computing Grid and the key role of this huge distributed infrastructure for the feasibility of the LHC data analysis.
There were quite a number of questions at the end of the session (not bad for a sunday-after-lunch one). Besides the most repeated one of "when exactly the LHC will start and how many days later you will discover new physics?" there was an interesting question asking about the similarities/differences between our LHC Grid and the now-so-famous Cloud Computing. We answered that, as of today, the LHC Grid and the Clouds available out there (like the Amazon one) are quite different. The LHC data processing, besides huge computing and storage capacities, needs a very big bandwith between those. Tier-1s are data centres specialiced in storing Petabytes of data and mining through all of this data using thousands of processors in a very efficient way. Trying to use the commercial Clouds to do this today, besides being too expensive, would most probably not meet the performance targets.
That said, we should all keep an eye on this new hype-word "the Cloud" as it will surely evolve in the next years and I am afraid our paths are poised to meet at some point. The LHC is today not a target customer for these Clouds, but what these giant companies are doing in order to be able to sell "resources as a service" is indeed very interesting and, as Wladawsky-Berger notes, is driving an "industrialisation" of IT data centers in a similar way as 25 years ago some companies like Toyota industralised the manufacturing process.
So, more productive, efficient and high-quality computing centers are coming out from the Clouds. We will definetely have to watch up to the sky very now and then, just to be prepared.
Thursday, 10 July 2008
Cosmic Rays Illuminate CMS II !
Wednesday, 9 July 2008
Cosmic Rays Illuminate CMS!
The fraction of CMS sub-detectors participating in CRUZET3 has steadily increased and includes from the first time all its components: the DT muon system, RPC barrel, CSC endcap, HCAL and barrel ECAL calorimeters, and the recently installed silicon strip tracker (the biggest tracker detector ever built!).
Last night (9.7.2008), over 1 million cosmic ray events were reconstructed on the tracker system. This is the first time we see triggered cosmic ray tracks in both TIB and TOB at the Tracker level:
Primary datasets are created using the new Tier-0 “repacker” in almost 'real time' and transferred to CAF and Tier-1 sites for prompt analyses. IN2P3 Tier-1 has the custodial responsibility to hold CRUZET3 data, although all Tier-1 sites are constantly receiving the cosmic data. During these two first days, ~3 TBs of data has landed to PIC, being the best Tier-1 site from Rate and Quality p.o.v (curiosly, yesterday we spent the whole day in scheduled downtime!).
Data volumes are expected to grow later this week as systems are better integrated on this commissioning exercise... So, we need to stay tuned! ;)



